General or specific structural inspection: which do I need?
23 November 2026 · Blog · Buying a homeWhen you contact a structural engineer about a house, you’ll usually be offered one of two types of inspection. Choosing the right one saves money and gets you the answer you actually need.
Specific inspection: one concern, looked at closely
A specific inspection focuses on a single defect or area: a crack, a bowing wall, a sagging floor, a removed chimney breast or a knocked-through wall. We look at it in detail, find the cause and tell you what, if anything, needs doing.
Choose it when:
• Your RICS survey or lender has flagged one particular issue
• You’ve noticed a new crack and want to know if it’s serious
• You need to know whether a past alteration was done properly
Guide price: £950 + VAT.
General inspection: the whole structure
A general inspection looks at the structure of the whole property: foundations and signs of movement, main walls, floors, roof structure, chimneys, past alterations and anything around the house that could affect it, such as trees, drains and retaining walls.
Choose it when:
• Your survey flagged several structural concerns
• You’re buying an older or unusual property, such as a period house, a building on a slope or a conversion
• You’re planning major works and want to understand the structure first
Guide price: approx. £1,700 + VAT.
Still not sure?
Send us the address and the extract from your RICS survey or lender’s valuation. We’ll tell you which inspection you need and give you a fixed quote, usually within 2 working hours. If a specific inspection is enough, we won’t sell you a general one.
What neither inspection is
Neither is a valuation or a full RICS building survey. We focus on the structure: whether the building is standing up properly, why it has moved and what to do about it. Damp, decorations and services are for your surveyor. Structural engineer or RICS surveyor? →
Common questions
Can a specific inspection be upgraded on the day?
If we find something more widespread when we visit, we’ll talk to you before going further, and explain the cost of extending the inspection.
Will my lender accept a specific inspection?
Usually, if it covers the issue the valuer raised. Check the lender’s wording, or send it to us and we’ll advise.
How quickly can you visit?
Usually within 3 working days, with the report typically within 48 hours of the visit. Express 24-hour reports are available on request.
See what’s in our reports →
Book a structural report →
Site visit within 3 working days · report within 48 hours · get in touch or call 020 3835 2633
More guides
• What’s in a structural engineer’s report?
• Can a structural engineer sign off work that’s already been done?
• My RICS survey says “refer to a structural engineer”
• How quickly can I get a structural report before exchange?
Send us the address and the extract from your RICS survey or lender’s valuation. We’ll tell you which inspection you need and give you a fixed quote, usually within 2 working hours. If a specific inspection is enough, we won’t sell you a general one.
What neither inspection is
Neither is a valuation or a full RICS building survey. We focus on the structure: whether the building is standing up properly, why it has moved and what to do about it. Damp, decorations and services are for your surveyor. Structural engineer or RICS surveyor? →
Common questions
Can a specific inspection be upgraded on the day?
If we find something more widespread when we visit, we’ll talk to you before going further, and explain the cost of extending the inspection.
Will my lender accept a specific inspection?
Usually, if it covers the issue the valuer raised. Check the lender’s wording, or send it to us and we’ll advise.
How quickly can you visit?
Usually within 3 working days, with the report typically within 48 hours of the visit. Express 24-hour reports are available on request.
See what’s in our reports →
Book a structural report →
Site visit within 3 working days · report within 48 hours · get in touch or call 020 3835 2633
More guides
• What’s in a structural engineer’s report?
• Can a structural engineer sign off work that’s already been done?
• My RICS survey says “refer to a structural engineer”
• How quickly can I get a structural report before exchange?